DSpace Repository

Assessments of Irrigation Water Requirement from Deduru Oya Left Bank Canal to Supplement Deduru Oya Left Bank Irrigation Demand

Show simple item record

dc.contributor.author Sampath, D. S.
dc.contributor.author Weerakoon, S. B.
dc.contributor.author Mishra, B. K.
dc.contributor.author Herath, S.
dc.date.accessioned 2021-11-29T07:36:16Z
dc.date.accessioned 2022-06-27T09:46:50Z
dc.date.available 2021-11-29T07:36:16Z
dc.date.available 2022-06-27T09:46:50Z
dc.date.issued 2014
dc.identifier.uri http://repo.lib.jfn.ac.lk/ujrr/handle/123456789/4280
dc.description.abstract Rainfall in Deduru Oya basin has a significant temporal variation and thus the Deduru Oya carry flash floods during rainy season and very low flows during dry season. The Deduru Oya reservoir under construction at the upstream of the existing RidiBediEla anicut will be useful to regulate discharge of the Deduru Oya for better utilizing the basin water resources especially for irrigation. The multi-purpose Deduru Oya reservoir project with a reservoir of a capacity of 75 Million Cubic Meters (MCM), augments water resources in 136 existing tank based irrigation systems in the Deduru Oya Left Bank through a Left Bank (LB) canal and also diverts water to the Iginimitiya tanking the Mee Oya basin through a Right Bank (RB)transbasin canal. This study develops a model for water management in LB canal development area and for the assessment of diversion requirement from the Deduru Oya reservoir through the LB Canal to supplement LB irrigation demand. Hydrological Engineering Center-Hydrological Modeling System (HEC-HMS) is used for runoff estimations and CROPWAT model is used to estimate crop water requirements. Water Evaluation And Planning (WEAP) model is used for water balance simulations in Deduru Oya LB canal development area and to calculate water requirements from LB canal for the period of recent 10 years. The study reveals that the annual water requirement from the LB canal for 100% cropping intensity in the proposed 3000 ha irrigable area in LB canal development area varies from 26 MCM to 41 MCM en_US
dc.language.iso en en_US
dc.publisher The Institution of Engineers, Sri Lanka en_US
dc.subject Irrigation Water Requirement en_US
dc.subject Deduru Oya Project en_US
dc.subject Hydrological Modeling en_US
dc.subject WEAP en_US
dc.title Assessments of Irrigation Water Requirement from Deduru Oya Left Bank Canal to Supplement Deduru Oya Left Bank Irrigation Demand en_US
dc.type Article en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record