dc.contributor.author | Weerasekera, A.I. | |
dc.contributor.author | Atputharajah, A. | |
dc.contributor.author | Ekanayake, J.B. | |
dc.date.accessioned | 2021-04-23T03:24:20Z | |
dc.date.accessioned | 2022-06-27T10:02:00Z | |
dc.date.available | 2021-04-23T03:24:20Z | |
dc.date.available | 2022-06-27T10:02:00Z | |
dc.date.issued | 2007 | |
dc.identifier.citation | Weerasekera, A. I., Arulampalam, A., & Ekanayake, J. B. (2007). Limitation on connecting mini hydro power plants to the Sri Lankan power system network: A case study at Balangoda Grid Substation. | en_US |
dc.identifier.uri | http://repo.lib.jfn.ac.lk/ujrr/handle/123456789/2656 | |
dc.language.iso | en | en_US |
dc.title | LIMITATION ON CONNECTING MINI HYDRO POWER PLANTS TO THE SRI LANKAN POWER SYSTEM NETWORK – A CASE STUDY AT BALANGODA GRID SUBSTATION | en_US |
dc.type | Article | en_US |